|
||||||||||||||
|
||||||||||||||
Method Statements and Risk AssessmentMethod statements and risk assessment from Kingstar Contracts throughout the UK.Our experienced staff are able to produce the highest level of documentation. From a health and Safety document through to the most detailed Method Statements and Risk Assessment, Kingstar are able to meet the most demanding of contractual requirements. |
||||||||||||||
|
||||||||||||||
Our
services:
Diamond Drilling
| Wire
Sawing | Wall Sawing
| Floor Sawing |
Silent
Concrete Crushing
Robotic
construction and demolition |
Controlled
Demolition | Concrete Bursting
| Chasing
Percussion
Drilling |
Concrete,
Brickwork Repairs | Grouting
| Mastic Pointing |
Method Statements